Regulations of the People's Republic of China on the Management of Pollution Damage to the Marine Environment from Coastal Engineering Construction Projects (Revised in 2007)


Regulations of the People's Republic of China on the Management of Pollution Damage to the Marine Environment from Coastal Engineering Construction Projects
(Announced by Order No. 62 of the State Council of the People's Republic of China on June 25, 1990, revised in accordance with the Decision of the State Council on Amending the Regulations of the People's Republic of China on the Management of Pollution Damage to the Marine Environment from Coastal Engineering Construction Projects on September 25, 2007)
Article 1: In order to strengthen the environmental protection management of coastal engineering construction projects, strictly control new pollution, protect and improve the marine environment, this regulation is formulated in accordance with the Marine Environmental Protection Law of the People's Republic of China.
Article 2: Coastal engineering construction projects referred to in these Regulations refer to new, renovated, or expanded engineering projects located on or connected to the coast, with the main body of the project located on the landward side of the coastline, and affecting the marine environment. Specifically, it includes:
（1） Port, dock, waterway, and coastal airport engineering projects;
（2） Shipyard, shipyard;
（3） Coastal thermal power plants, nuclear power plants, and wind power plants;
（4） Coastal material storage facility engineering project;
（5） Industrial engineering projects such as coastal mining, chemical, light industry, and metallurgy;
（6） Solid waste, sewage and other pollutant treatment and disposal projects for discharge into the sea;
（7） Large scale coastal aquaculture farms;
（8） Coastal protection projects, sand and gravel yards, and water conservancy facilities at estuaries;
（9） Binhai Petroleum Exploration and Development Engineering Project;
（10） Other coastal engineering projects designated by the competent department of environmental protection of the State Council in conjunction with the competent department of marine affairs of the country.
Article 3: This regulation applies to all units and individuals who construct coastal engineering projects within the territory of the People's Republic of China.
The environmental protection management of the construction project of shipbreaking yards shall be implemented in accordance with the Regulations on the Prevention of Environmental Pollution Caused by Shipbreaking.
Article 4: Coastal engineering construction projects shall comply with the requirements of the regional environmental protection plan of the economic zone where they are located.
Article 5: The competent department of environmental protection under the State Council is responsible for the environmental protection work of coastal engineering construction projects nationwide.
The environmental protection department of the local people's government at or above the county level along the coast is responsible for the environmental protection work of coastal engineering construction projects within its administrative region.
Article 6: New construction, renovation, and expansion of coastal engineering projects shall comply with relevant national regulations on environmental protection management for construction projects.
Article 7: The construction unit of coastal engineering construction projects shall prepare an environmental impact assessment report (form) during the feasibility study stage, and submit it to the competent environmental protection department for approval after preliminary review by relevant departments in accordance with the provisions of environmental protection laws and regulations.
Before approving the environmental impact assessment report of coastal engineering construction projects, the environmental protection authority shall solicit opinions from the maritime and fishery authorities, as well as the military environmental protection department.
It is prohibited to reclaim land from the sea in areas with shipping value in natural harbors, important seedling bases and breeding sites, as well as natural spawning grounds, breeding grounds, feeding grounds and important migration routes of fish, shrimp, crab, shellfish and algae on the water surface and mudflat.
Article 8: In addition to being prepared in accordance with relevant regulations, the content of the environmental impact assessment report for coastal engineering construction projects shall also include:
（1） The environmental conditions of the location and its surrounding waters;
（2） The potential impact on the marine environment during and after the construction process;
（3） Conclusion on the feasibility study of marine environmental protection measures and their technical and economic feasibility;
（4） Conclusion of Marine Environmental Impact Assessment for Construction Projects.
The environmental impact assessment form for coastal engineering construction projects shall be filled out in accordance with the provisions of the preceding paragraph.
Article 9: It is prohibited to construct Sino foreign joint ventures, Sino foreign cooperative enterprises, and foreign-funded enterprises that transfer pollution to the waters and coasts of the People's Republic of China; The introduction of technology and equipment in coastal engineering construction projects should have corresponding pollution prevention and control measures to prevent the transfer of pollution.
Article 10: Coastal engineering construction projects that pollute the environment or damage the landscape shall not be constructed in marine special protection areas, marine nature reserves, seaside scenic areas, salt field protection areas, beach resorts, important fishery waters, and other areas that require special protection; Construction of coastal engineering projects outside its area shall not damage the environmental quality of the aforementioned areas. Except as otherwise provided by laws and regulations.
Article 11: Units undertaking environmental impact assessments for coastal engineering construction projects shall obtain the "Qualification Certificate for Environmental Impact Assessment of Construction Projects" in accordance with the law and undertake assessment tasks within the scope specified in the certificate.
Article 12: When a coastal engineering construction project is completed and accepted, the environmental protection facilities of the construction project shall be inspected and approved by the competent environmental protection department before the construction project can be officially put into production or use.
Article 13: The environmental protection department of the people's government at or above the county level, in accordance with its project management authority, may conduct on-site inspections of coastal engineering construction projects in conjunction with relevant departments. The inspected party shall truthfully report the situation and provide information. The inspector has the responsibility to keep technical and business secrets confidential for the inspected party. Except as otherwise provided by laws and regulations.
Article 14: Facilities for discharging wastewater into the sea shall make reasonable use of the self purification capacity of seawater and select the location of the discharge outlet. For discharge using underground ditches or pipelines, the outlet of the water pipe should be located below the low tide line.
Article 15: When constructing ports and docks, anti pollution facilities that are suitable for their throughput capacity and cargo types shall be installed.
Ports, oil terminals, and hazardous chemical terminals should be equipped with emergency equipment and devices for major pollution damage accidents at sea.
If the existing ports and docks do not meet the requirements of the first two paragraphs, the environmental protection department shall, in conjunction with the port and dock authorities, order them to set up or equip within a specified period of time.
Article 16: When constructing shipyards and repair yards on the shore, appropriate facilities for receiving and treating residual and waste oil, oily wastewater, oil interception, collection, and disposal facilities, industrial wastewater, and industrial and ship waste should be set up according to their nature and scale.
Article 17: The construction of coastal nuclear power plants and other nuclear facilities shall strictly comply with the relevant national regulations and standards on nuclear environmental protection and radiation protection.
Article 18: When constructing onshore oil depots, facilities for receiving and treating oily wastewater, as well as facilities for collecting and treating surface flushing wastewater and emergency response facilities for accidents, shall be installed; Oil pipelines and storage facilities shall comply with the national regulations on leakage and corrosion prevention.
Article 19: In the construction of coastal mines, measures shall be taken in accordance with relevant regulations to prevent pollution and damage to the marine environment during the processes of mining, beneficiation, transportation, storage, smelting, and tailings treatment.
Article 20: When constructing coastal garbage dumps or industrial waste landfills, protective embankments and bottom sealing layers should be built, and systems for collecting, exporting, and treating leachate and explosion-proof devices for combustible gases should be installed.
Article 21: When constructing coastal protection projects, water conservancy facilities, waterways, or comprehensive improvement projects at the mouth of a river, measures shall be taken and ecological environment and aquatic resources shall not be damaged.
Article 22: The construction of coastal engineering projects shall not alter or damage the living environment of nationally and locally protected wildlife and plants. Coastal engineering construction projects that may cause pollution and damage to the living environment of key protected wildlife and plants shall not be constructed; If it is necessary to construct, the consent of the administrative department in charge of wildlife and plants shall be obtained, and the construction unit shall be responsible for organizing and taking measures such as relocation breeding to ensure the continuity of the species.
If the construction of gates or dams in the migration channels of fish, shrimp, crabs, and shellfish has a serious impact on fishery resources, the construction unit shall construct fish passage facilities or take other remedial measures.
Article 23: Collective owned units or individuals who construct aquaculture projects that cannot form basic construction projects in water bodies or tidal flats owned by the whole people shall carry out such projects within the areas planned by local people's governments at or above the county level.
Collective owned units or individuals engaged in sporadic business mining of sand and gravel shall excavate within the designated areas of the local people's governments at or above the county level.
Article 24: It is prohibited to construct coastal engineering projects that damage the ecosystems of mangroves and coral reefs in areas where they grow.
Article 25: The construction of coastal engineering projects shall prevent abnormal erosion of the coast.
It is prohibited to engage in activities that endanger the safety of coastal protection facilities, such as blasting, excavating sand and gravel, and taking soil, within the protection range of coastal protection facilities specified by the management department of coastal protection facilities. Without the approval of the relevant competent department authorized by the State Council, it is not allowed to occupy or dismantle coastal protection facilities.
Article 26: Those who construct coastal engineering projects without holding reviewed and approved environmental impact assessment reports (forms) shall be punished in accordance with Article 80 of the Marine Environmental Protection Law of the People's Republic of China.
Article 27: Refusing or obstructing the environmental protection department from conducting on-site inspections, or falsifying information during inspections, shall be punished by the environmental protection department of the people's government at or above the county level in accordance with Article 75 of the Marine Environmental Protection Law of the People's Republic of China.
Article 28: If the environmental protection facilities of a coastal engineering construction project are not completed or do not meet the prescribed requirements, and the project is put into production or use, it shall be punished in accordance with Article 81 of the Marine Environmental Protection Law of the People's Republic of China.
Article 29: If staff members of the environmental protection department abuse their power, neglect their duties, or engage in favoritism and fraud, they shall be subject to administrative sanctions by their respective units or higher-level competent authorities; Those who commit crimes shall be held criminally responsible in accordance with the law.
Article 30: This regulation shall come into effect on August 1, 1990.